Distribution Center

Distribution Center

CASE STUDY DISTRIBUTION CENTER FACTS The subject property is a newly constructed 97,000 square foot distribution center. It is situated on 19 acres and was placed-in-service in 2018. The company is a distributor of chemicals and other products for the commercial...
Banks

Banks

CASE STUDY BANKS FACTS The subject property is a bank that was newly constructed in 2019 for $2,400,000. The building included four teller windows, bank vault doors, teller windows, and pneumatic tube systems. There were also site improvements such as asphalt paving,...
Fitness Center

Fitness Center

CASE STUDY FITNESS CENTER FACTS The subject property is a 32,000 square foot fitness center that was acquired in 2015 for $2,300,000. The building is a one-story, steel frame structure, with an elastomeric embrane roof, and with brick and EIFS veneer. Interior...
Data Center

Data Center

CASE STUDY DATA CENTER FACTS The subject property is a, relatively small, two story data center colocation facility that was built in an existing structure. The construction costs Source Advisors examined was $7,100,000 and it was placedin-service in 2015. The...
Grocery Store

Grocery Store

CASE STUDY GROCERY STORE FACTS The subject property is a high end, newly constructed, free-standing grocery store. The construction costs Source Advisors examined was $18,100,000 and it was placed-in-service in 2017. The store is 48,000 square feet and sits on a three...